 |  |
 |  |
 |
 |
Step 1 Create a flat right angle weave piece. This piece is five 4-bead units by three rows. |  | Step 2 Bring both sides of the piece together. The outer edge beads should match up. |  | Step 3 Make sure that the thread is coming up through the bottom left edge bead. |
 |
 |  |
 |  |
 |
 |
Step 4 String one bead. |  | Step 5 Go down through the bottom right edge bead. |  | Step 6 String one bead. |
 |
 |  |
 |  |
 |
 |
Step 7 Go back up through the bottom left edge bead. |  | Step 8 Go back through the added bead that is second from the bottom. |  | Step 9 Go up through the next edge bead on the right. |
 |
 |  |
 |  |
 |
 |
Step 10 String one bead. |  | Step 11 Go down through the edge bead second from the bottom. |  | Step 12 Go back through the added bead second from the bottom. |
 |
 |  |
 |  |
 |
 |
Step 13 Go back up through the right edge bead second from the bottom. |  | Step 14 Go back through the third added bead from the bottom. |  | Step 15 Go up through the left edge bead third from the bottom. You have now woven the needle around in a figure-8. |
 |
 |  |
 |  |
 |
 |
Step 16 String one bead. |  | Step 17 Go down through the right edge bead third from the bottom. |  | Step 18 Go back through the third added bead from the bottom. |
 |
 |  |
 |  |
 |
 |
Step 19 Go up through the third edge bead from the bottom. |  | Step 20 Go through the fourth added bead from the bottom. |  | Step 21 Go up through the right edge bead fourth from the bottom. |
 |
 |  |
 |  |
 |
 |
Step 22 String one bead. |  | Step 23 Go down through the left edge bead fourth from the bottom. |  | Step 24 Go back through the fourth added bead from the bottom. |
 |
 |  |
 |  |
 |
 |
Step 25 Go back up through the right edge bead fourth from the bottom. |  | Step 26 Go through the fifth added bead from the bottom. |  | Step 27 Go up through the left edge bead fifth from the bottom. |
 |
 |  |
 |  |
 |
 |
Step 28 String one bead. |  | Step 29 Go down through the right edge bead fifth from the bottom. |  | Step 30 Go back through the fifth added bead from the bottom. |
 |
 |  |
 |  |
 |
 |
Step 31 Reinforce the tube bead by going through the beads in a figure-8 fashion. |  | Step 32 Cut the thread. |  | Step 33 Clean up the ends of your thread, using a Perfect End Thread Burner. Burn, or melt, the end of your thread until the end is no longer visible. |
 |
 |  |
 |  |
 |
 |
Step 34 Congratulations! You have completed a right angle weave tube bead! |  | Step 35 - Connecting Two Ends or Two Tube Beads Make sure that the two ends or two tube beads are the same thickness. In this case the tubes are 4 beads thick. |  | Step 36 Turn the tubes so the ends to be connected are facing you. |
 |
 |  |
 |  |
 |
 |
Step 37 Go up through the left bead on the right tube. |  | Step 38 String one bead. |  | Step 39 Go down through the right bead on the left tube. |
 |
 |  |
 |  |
 |
 |
Step 40 String one bead. |  | Step 41 Go back up through the left bead on the right tube. |  | Step 42 Go through those four beads again to reinforce the connection. Exit the needle through the top center bead. This has now connected the tubes on one of the four sides. |
 |
 |  |
 |  |
 |
 |
Step 43 Bring the two ends of the tubes together so that they lay paralell to each other. |  | Step 44 Having come out of the center bead, now go down through the next edge bead on the left tube. |  | Step 45 String one bead. |
 |
 |  |
 |  |
 |
 |
Step 46 Go up through the edge bead on the right tube. This will finish the connection on this side of the tube. |  | Step 47 Go back though those four beads again to reinforce the connection. Exit the needle from the bottom bead. |  | Step 48 Rotate the tube so the bead you just exited from is at the top. |
 |
 |  |
 |  |
 |
 |
Step 49 Go down through the edge bead on the right tube. |  | Step 50 String one bead. |  | Step 51 Go up through the edge bead on the left tube. |
 |
 |  |
 |  |
 |
 |
Step 52 Go back through the top bead. |  | Step 53 Go through those four beads again to reinforce the connection. Exit the needle from the bottom bead. |  | Step 54 Rotate the tube again so that the bead that you just exited from is at the top. |
 |
 |  |
 |  |
 |
 |
Step 55 Reinforce the last of the four sides by going through the left bead. |  | Step 56 Go through the bottom bead. |  | Step 57 Go up through the right bead. |
 |
 |  |
 |  | |
 |
Step 58 Go through those four bead again to reinforce the connection. |  | Step 59 Congratulations! The two ends of the right angle weave tubes are now connected. |  |
|
 |